METHOD STATEMENT PACKAGE — ROAD AND HIGHWAY PROJECT

Total method statements: 33
Total editable Microsoft Word files: 66 (33 English + 33 Bahasa Malaysia)

IMPORTANT
Every template must be reviewed and adapted by a competent project team against the contract, approved drawings, project specification, actual site conditions, approved materials, manufacturer instructions, applicable Malaysian legal requirements and the Consultant's submission procedure before use.

CONTENTS
MS-CST-001 — Site Clearing and Disposal
MS-CST-002 — Surveying and Setting Out
MS-CST-003 — Earth Excavation
MS-CST-004 — Filling and Compaction
MS-CST-006 — Reinforcement Installation
MS-CST-007 — Concrete Formwork
MS-CST-008 — Reinforced Concrete Placement
MS-INF-001 — Road Subbase and Roadbase
MS-INF-002 — Asphalt Pavement
MS-INF-003 — Kerb and Channel
MS-INF-004 — Surface Drainage
MS-INF-005 — Sewer Pipeline
MS-INF-006 — Water Reticulation
MS-INF-007 — Street Lighting and External Cabling
MS-INF-008 — Soft Landscape Works
MS-SAF-001 — Mobilisation, Hoarding and Site Facilities
MS-SAF-002 — Scaffold Erection and Dismantling
MS-SAF-003 — Crane Lifting Operations
MS-SAF-004 — Confined Space Work
MS-SAF-005 — Hot Work
MS-SAF-006 — Temporary Dewatering
MS-SAF-007 — Controlled Demolition
MS-PBG-005 — Soil Nailing and Slope Stabilisation
MS-HWY-001 — Highway Embankment Construction
MS-HWY-002 — Subgrade Preparation and Stabilisation
MS-HWY-003 — Cement-Treated Base Construction
MS-HWY-004 — Asphalt Milling and Resurfacing
MS-HWY-005 — Prime Coat, Tack Coat and Asphalt Joint Preparation
MS-HWY-006 — Road Marking Installation
MS-HWY-007 — Highway Signs and Gantry Installation
MS-HWY-008 — Guardrail and Concrete Safety Barrier Installation
MS-HWY-009 — Box Culvert Construction
MS-HWY-010 — Traffic Management and Temporary Diversion