METHOD STATEMENT PACKAGE — SPECIALIST PILING WORKS

Total method statements: 12
Total editable Microsoft Word files: 24 (12 English + 12 Bahasa Malaysia)

IMPORTANT
Every template must be reviewed and adapted by a competent project team against the contract, approved drawings, project specification, actual site conditions, approved materials, manufacturer instructions, applicable Malaysian legal requirements and the Consultant's submission procedure before use.

CONTENTS
MS-CST-005 — Bored Piling
MS-PBG-001 — Driven Piling
MS-PBG-002 — Micropile Installation
MS-SPG-001 — Prestressed-Concrete Spun-Pile Installation
MS-SPG-002 — Precast Reinforced-Concrete Pile Installation
MS-SPG-003 — Hydraulic Jack-In or Injection Pile Installation
MS-SPG-004 — Driven Steel H-Pile Installation
MS-SPG-005 — Driven Steel Pipe-Pile Installation
MS-SPG-006 — Continuous-Flight-Auger Pile Installation
MS-SPG-007 — Barrette Pile Construction
MS-SPG-008 — Static Pile Load Testing
MS-SPG-009 — Pile Integrity and Dynamic Load Testing